| AJINOMOTO ENGINEERING (2001) (THAILAND) Co., Ltd. |
21.00 MB |
| Ajinomoto KPP Factory |
Electrical & Instruction Works for STPP (N4) Project & Miscellaneous Work |
Kamphaeng Phet |
|
| Ajinomoto PPD Factory |
Electrical & Communication Installation Works and Miscellaneous Work |
Prapradaeng |
|
| Ajinomoto LLK Factory |
Electrical & Communication Work for New Warehouse and Miscellaneous Work |
Pathumthani |
|
| CH.KARNCHANG PUBLIC CO.,LTD. |
|
|
|
Southern Outer Bangkok Ring Road
|
E&M ERECTION WORK (Addition)
Floodlight 2x400W HPS.14M Post Top
Main Feeder Route - Conduit Work
Electrical Work for TSB Type C (Exit No.2,Exit No.4 )
E&M Work for Stair Tower ,Walk Way ,Cat Walk
|
Bangkhunthian,Suksawat
|
9.02 MB
|
| FUJIDENKI ENGINEERING CO., LTD. |
|
|
| Siam Yamato Steel-2 Co.,Ltd |
Main Power Supply Overhead Crane At Melt Shop |
Maptaput Rayong |
6.30 MB |
|
Crane ( Melt Shop) 2 Sets |
|
|
|
Electrical Work For Melt Shop ( Underground DCS) |
|
|
| GETABEC ENERGY CO., LTD. |
|
|
8.28 MB |
|
Auxiliary Boiler EPS
|
Electrical Construction Works
Main Power Supply and Install MDB 001,002
Cable Duct Work
|
Maptaput - Rayong
|
|
| SCHNEIDER (THAILAND) LIMITED |
|
2.25 MB |
| PTTAN AN and MMA |
Busduct Installaiton for LSB,MCC,MSB Area |
Eastern Industrail Estate.
|
|
|
Map Ta Phut , Rayong
|
| THAI TOKO ENGINEERING CO., LTD. |
All Area |
131.49 MB |
| Aapico Plastic Fuel Tank Factory |
Electrical Construction Work |
Amata Nakorn Ind |
|
|
Install Flood Light 400W MH AT Factory Area |
|
|
|
|
|
|
| Nitto Matex Factory |
Electrical & Communlcation Installation Works |
Amata Nakorn Ind |
|
|
For Mezzanine Floor 2 , 3 |
|
|
|
Renovation Exshaust Fan |
|
|
| Kyokuyo Factory |
Electrical & Communication System Intallation Work for KIT-2 & Maintenace Work |
Amata Nakorn Ind |
|
|
Kokuyo -IK Factory
|
Electrical Construction Work |
Bangpoo Ind. |
|
|
Electrical Installation Work ( Fire Alarm System) |
|
|
|
Re Install for HI-BAY Injection Area |
|
|
|
|
|
|
|
ARST Factory
|
Electrical & Communlcation Installation Works and Maintenance Works
Receptacle Addition Work for 2FL. Office
Site Temporary Work
Electrical Work For compresssor Room
Main Power Supply Crane 20 T
Main Power Supply Pump Pit Press Machine
Install Annunciator Panel Office 2 Fl.
Main Power Supply Shutter Door & Temporary Site
Lighting System For Line Scrap
|
Amata Nakorn Ind
|
|
|
|
|
|
| Hitachi Factory |
Electrical & Communication Installation Works |
304 Industrial Park |
|
|
Utilities Installation Support SSW Test Area Ph-1 |
|
|
|
Installation Yellow Raceway at Test Area Ph-2 |
|
|
|
Installation Blue Raceway for Acoustc at Ph-1 |
|
|
|
Relocated Raceway Red & Blue at Phade-1 = 2 Set |
|
|
|
Power Supply for AHU & Booter fan at Phase-1 |
|
|
|
Installation Green Raceway = 6 Set at Ph-2 |
|
|
|
Modify Yellow Raceway = 11 Set at Test Area Ph-2 |
|
|
|
UtiliitIes Electrical Installation Work at PH-1 |
|
|
|
Thai Kurabo Factory
|
Electrical & Communication Installation Works
Main Feeder Supply Wome/S/ Room at Domitory Area
Relocation Miniconda Machine at Miniconda Area
Relocation Miniconda Machine at Miniconda Area
Power Supply Exit Light
Main Supply Inverter Panel for Compressor 22KW
Power Supply Heatset Machine at DTF Machine Area
Main Feeder Supply for DTF Machine at DTF Area
Power Supply DTF Machine 13 Sets at DTF Area
|
Klong Loung Pathumthai
|
|
|
|
|
|
| CMK Factory |
Electrical & Communication Installation Works |
304 Industrial Park |
|
|
CMK Extension Phase 3 |
|
|
|
Relocated Receptacle Overhead Wire Way =3 Set |
|
|
|
Power Supply Machine for NC Room |
|
|
|
Power Supply for Sus Plate Po Lishing & Press Line 1F |
|
|
|
Power Supply for Machine (FA-3) |
|
|
|
Main Power Supply Machine For DD-3 |
|
|
|
Main Power Supply (AG-1) (AG-2) (AG-3) For X-Ray |
|
|
|
|
|
|
|
SIIX EMS
|
Electrical Work for Ass'y Division Mezzanine Floor
Renovation Ware House Building Works
Electrical Wrok for Modify Clean Rm.
Installation Receptacle ,Telephone ,Lan System at
Office Area
|
Prapadaeng
|
|
| Thai Fukuvi Co.,Ltd |
Electrical & Communication Installation Works |
Bangpoo Industrial Estate |
|
|
Change Level Lighting Fixture In Factory 1 |
|
|
|
Electrical Installaiton Work for Expansion Factory |
|
|
|
LSD Factory
|
Electrical &Installation Works and Maintenance Works
Renovation Work for LSD# 1
Remove Machine Factory # 3 to Factory # 1
Change New Celing at LSD # 2
Change New Celing at LSD # 1
Electrical for New Locker Room LSD # 1
Relocate Machine From LSD # 2 To LSD# 3
Power Supply Rubber Dome MC
Installation Lighting & Receptacle at Dising Rm; Laser RM
Room & Laser Room
|
Lamphun
|
|
| TOYO-THAI CORPORATION PUBLIC COMPANY LIMITED |
|
|
| ACTH MTA-8 |
Electrical Construction Work |
Phrapradaeng |
4.50 MB |
| PPCL BPA Project |
Electrical Construction Work |
Padaeng Ind. Est |
34.69 MB |
| PTTPE Ethane Cracker Project |
Electrical Construction Work and Maintenance Work |
Maptaput - Rayong |
29.46 MB |
|
(Addition Work) |
|
|
| VECTOR THAI TECHNOLOGY CO.,LTD. |
|
|
| Nam Theun-2 Hydroelectric Project |
Pipe Welding test for Dewatering System CW1 & CW3 |
Loas P.D.R |
26.99 MB |
|
Installation Dewatering Drainage System at Gallery |
|
|
|
for CW-3 (Regulating Dam) |
|
|
|
|
|
|
|
Miscellaneous & Maintenance Works |
All Year |
15.02 MB |
|
|
|
|
|
SUMMARY - 2009
|
289.00 MB
|